|
|
|
Location
3
(Temporary Fixed)
|
|
Frequencies (10)
|
32.0
km radius around a fixed location
1
|
NEPA Required |
|
Quiet Zone Notification Date |
|
Quiet Zone Consent |
|
Is coordination with Canada required? |
No
|
Is coordination with Mexico required? |
|
Special
Condition |
Temporary operations are authorized on a secondary basis and must protect all exclusive or centralized trunked licensees pursuant to Rule § 90.187, regardless of whether the temporary operations were authorized before or after the exclusive or centralized trunked licensee
|
|
|
|
|
|
|
|
|