Call Sign
|
WQOG824 |
Radio Service |
YG - Industrial/Business Pool, Trunked |
|
Applications |
Receipt Date |
File
Number and Type |
Status |
05/30/2024
|
0011096945
NT
- Required Notification
(S)
|
Accepted
|
08/22/2023
|
0010667467
NT
- Required Notification
(S)
|
Accepted
|
06/02/2023
|
0010407473
AM
- Amendment
|
Granted
|
All Applications (35)
|
Automated Letters and Authorizations |
05/29/2024 |
7728539 Construct/Coverage Reminder -- Licensee
7728539 Construct/Coverage Reminder -- Contact
|
05/29/2024 |
7729327 Construct/Coverage Reminder -- Licensee
7729327 Construct/Coverage Reminder -- Contact
|
07/18/2023 |
7536649 Construct/Coverage Reminder -- Licensee
7536649 Construct/Coverage Reminder -- Contact
|
All Automated Letters and Authorizations (6)
|
Comments |
None |
History |
05/29/2024
|
Construction/Coverage Reminder Letter Sent
|
08/28/2023
|
License Modified
|
07/18/2023
|
Construction/Coverage Reminder Letter Sent
|
All History (16)
|
Special
Conditions
Refer to Locations and Frequencies Tabs
for special conditions at those levels
|
Grant of FB8 status is conditional on licensee meeting loading requirement. The Commission may, without notice or hearing, change the station class code to remove the protection status of FB8 facilities based on the loading/operational status of the facilities at construction deadline.
|
Authorized by waiver of rule 90.307(d) granted 8/28/2023. MB concurs with this request.
|
Antenna structures for land, base and fixed stations authorized for operation at temporary unspecified locations may be erected without specific prior approval of the Commission where such antenna structures do not exceed a height of 60.96 meters (200 feet) above ground level; provided that the overall height of such antennas more than 6.10 meters (20 feet) above ground, including their supporting structures (whether natural formation or man-made), do not exceed any of the slope ratios set forth in Section 17.7(b). Any antenna to be erected in excess of the foregoing limitations requires prior Commission approval. Licensees seeking such approval should file application for modification of license. In addition, notification to the Federal Aviation Administration is required whenever the antenna will exceed 60.96 meters (200 feet) above the ground and whenever notification is otherwise required by Section 17.7 of the Commission's Rules. Such notification should be given by filing FAA Form 7460-1, Notice of Proposed Construction or Alteration, in duplicate, with the nearest office of the Federal Aviation Administration, which form is available from that office.
|
All Special Conditions (4)
|
Attachments |
Type |
Description |
Date Entered |
None |
|
|
|
|
|
|