Call Sign
|
WQKE988 |
Radio Service |
YE - PubSafty/SpecEmer/PubSaftyNtlPlan,806-817/851-862MHz,Trunked |
|
Applications |
Receipt Date |
File
Number and Type |
Status |
07/15/2015
|
0006876033
CA
- Cancellation of License
|
Granted
|
07/14/2015
|
0006841077
WD
- Withdrawal of Application
|
Withdrawn
|
06/17/2015
|
0006786265
WD
- Withdrawal of Application
|
Withdrawn
|
All Applications (11)
|
Automated Letters and Authorizations |
07/07/2015 |
6024176 Construct/Coverage Reminder -- Licensee
|
04/02/2013 |
5569313 Construct/Coverage Reminder -- Licensee
|
06/02/2010 |
4984686 Auto Termination letter -- Licensee
4984686 Auto Termination letter -- Contact
|
All Automated Letters and Authorizations (4)
|
Comments |
07/27/2010
|
Frequency 809.46250000, Antenna 1, Location 3 : has been returned to Active status as a result of an approved PFR.
|
07/27/2010
|
Frequency 809.38750000, Antenna 1, Location 3 : has been returned to Active status as a result of an approved PFR.
|
07/27/2010
|
Frequency 809.31250000, Antenna 1, Location 3 : has been returned to Active status as a result of an approved PFR.
|
All Comments (24)
|
History |
07/28/2015
|
License Canceled
|
07/14/2015
|
Application receipt email sent: ULS email
|
07/07/2015
|
Construction/Coverage Reminder Letter Sent
|
All History (15)
|
Special
Conditions
Refer to Locations and Frequencies Tabs
for special conditions at those levels
|
Prior to commencing operations on any channel or channels specified under this authorization, the licensee must provide at least 60 days written or electronic notice to Sprint Nextel Corporation that it intends to activate the channel(s) for testing or commencement of operations. Sprint Nextel must cease operation on the channel(s) specified in the notice by the intended date to the extent necessary to comply with the co-channel spacing requirements of 90.621(b), after which the licensee may activate the channel(s). Sprint Nextel Corporation has established an email box to receive these notifications at 800mhzinterleavedspectrum@sprint.com.
|
Failure to certify annually as to station construction commitments will terminate the authority for the extended implementation period and will require complete system construction within six months of the first missed annual certification date.
|
Attachments |
Type |
Description |
Date Entered |
Other
|
DA 10-1355
|
07/27/2010
|
Pleading
- Petition for Reconsideration
|
Petition for Reconsideration
|
05/14/2010
|
|
|
|
|
|
|