Call Sign
|
WPJX747 |
Radio Service |
YJ - Business/Industrial/Land Trans, 809-824/854-869 MHz, Trunked |
|
Applications |
Receipt Date |
File
Number and Type |
Status |
12/01/2021
|
0009816329
MD
- Modification
|
Granted
|
09/20/2021
|
0009718781
AU
- Administrative Update
|
Granted
|
09/14/2021
|
0009709922
RO
- Renewal Only
|
Granted
|
All Applications (19)
|
Automated Letters and Authorizations |
09/13/2021 |
6848313 Renewal Reminder -- Licensee
|
05/17/2016 |
6146634 Construct/Coverage Reminder -- Contact
|
05/17/2016 |
6146633 Construct/Coverage Reminder -- Licensee
|
All Automated Letters and Authorizations (5)
|
Comments |
|
PER TELEPHONE CONSERVATION WITH BARBARA RUSSEL THIS SYSTEM WILL CONSTRUCT WITHIN THE REQUIRED TIME SO THEY DON'T NEED SLOW GROWTH. [D3G]
|
History |
01/24/2022
|
License Modified
|
09/21/2021
|
Administrative Update Applied
|
09/15/2021
|
License Renewed
|
All History (30)
|
Special
Conditions
Refer to Locations and Frequencies Tabs
for special conditions at those levels
|
Waivers of Licensing Freeze in the Mexican Border Region and Rule 90.617(g) are granted 8-8-19. These waivers are granted for the express purpose of facilitating replacement of AEP’s legacy 800 MHz system in south and central Texas. Any existing 800 MHz spectrum in the vicinity that is no longer necessary for the new system to replace the legacy system may not be repurposed and must be canceled after implementation of the new system. Commission staff may inquire regarding status of existing 800 MHz channels in the vicinity after receipt of construction notification for the facilities granted herein.
|
Authorized by waiver of the freeze on 800 MHz applications granted 12/15/2020.
|
Failure to certify annually as to station construction commitments will terminate the authority for the extended implementation period and will require complete system construction within six months of the first missed annual certification date.
|
Attachments |
Type |
Description |
Date Entered |
None |
|
|
|
|
|
|