Call Sign
|
WQAN574 |
Radio Service |
TP - TV Pickup |
|
Applications |
Receipt Date |
File
Number and Type |
Status |
07/23/2010
|
0004221038
AM
- Amendment
|
Granted
|
04/21/2010
|
0004221038
MD
- Modification
|
Inactive
|
12/08/2005
|
0002403444
NT
- Required Notification
(S)
|
Accepted
|
All Applications (4)
|
Automated Letters and Authorizations |
10/11/2005 |
3757471 Construct/Coverage Reminder
|
Comments |
07/29/2022
|
License renewed since parent station was renewed IN CDBS.
|
10/25/2014
|
License renewed since parent station was renewed IN CDBS.
|
04/28/2009
|
License renewed since parent station was renewed IN CDBS.
|
All Comments (6)
|
History |
08/03/2022
|
Action PN Generated
|
07/30/2022
|
Paperless Authorization Printed
|
07/29/2022
|
License Renewed
|
All History (30)
|
Special
Conditions
Refer to Locations tab and Frequencies on the path tab for special conditions at those levels
|
In accordance with Paragraph 59 of the Commission's Second Report and Order and Second Memorandum Opinion and Order in ET Docket No. 95-18, and Section 2.106, Table of Frequency Allocations, footnote NG156, as amended, any new frequencies in or overlapping the 2008-2025 MHz frequency band are permitted only on a basis secondary to the Mobile-Satellite Service (MSS) and will be required to cease operation during Phase 2 of the relocation to accommodate MSS. Further, all new frequencies in or overlapping the greater 2008-2110 MHz frequency band will be required to relocate consistent with the Phase 1 and 2 band plans adopted jointly by the BAS Frequency Coordinator and Existing Licensees of their Nielsen Designated Market Area, as described in Section 74.690(e), and will not be eligible for relocation by an MSS entity, but each licensee must prepare for such relocations at its own expense.
|
Antenna structures for land, base and fixed stations authorized for operation at temporary unspecified locations may be erected without specific prior approval of the Commission where such antenna structures do not exceed a height of 60.96 meters (200 feet) above ground level; provided that the overall height of such antennas more than 6.10 meters (20 feet) above ground, including their supporting structures (whether natural formation or man-made), do not exceed any of the slope ratios set forth in Section 17.7(b). Any antenna to be erected in excess of the foregoing limitations requires prior Commission approval. Licensees seeking such approval should file application for modification of license. In addition, notification to the Federal Aviation Administration is required whenever the antenna will exceed 60.96 meters (200 feet) above the ground and whenever notification is otherwise required by Section 17.7 of the Commission's Rules. Such notification should be given by filing FAA Form 7460-1, Notice of Proposed Construction or Alteration, in duplicate, with the nearest office of the Federal Aviation Administration, which form is available from that office.
|
Attachments |
Type |
Description |
Date Entered |
None |
|
|
|
|
|
|